Project Summary
Lean Project Name
*
*
Unique ID
*
Lean Project Description
*
*
Lean Project Summary
*
Innovative approach to installation pile caps utilising pre-fabricated shutters
Lean Project Benefits Summary
*
Overall savings= £97,808.33 - £11,581.25 = £86,277.08 (National Highways Digital Efficiency Reference 4818)
Roads Period Efficiency Reported
RP1 2015-2020
RP2 2020-2025
RP3 2025-2030
N/A
Efficiency Value Assured
*
£
Efficiency Register ID
Image
Choose File
---
Lean Construction Development Programme (LCDP) Project
Lean Construction Development Programme (LCDP) Project
No
Lean Construction Development Programme (LCDP) Project
Yes
Supplier
*
Contact Email
*
*
*
Stakeholders involved in project
*
Stakeholders Involved - Other
*
Problem Solving Strategy (DMAICT)
Define
*
Prior to main works starting on site, several test piles were capped using the cardboard shutters. After having examples of cardboard shutters being damaged for water and the effort required to keep the shutter in position during concrete fill, the subcontractor L&A decided to seek alternative solutions before proceeding with the 6000 additional pile caps.
Measure
*
The original solution, as per typical of the process was to use cardboard shutters to contain the concrete that would be poured on top of the pile, creating a mushroom shape pile cap. This process carries a cost of over £90,000 in materials (approx. £15 per cardboard shutter) and they prove difficult to store on site due to the waxed cardboard material which are more prone to damage from rain, therefore typically require storage units erected close to the work area for storage.
Analyse
*
• "Waxed cardboard shutters 6050 x £15 (approx)" -£90,750.00 • "Estimated rework cost based on repositioning/damaging of cardboard from machine and or positioning (1 in 30 piles)= (6050/30*£35) • £35 based on £15 cardboard shutter cost/damage and £20 time/machine cost"= £7,058.33 • Additional process step of removing steel shutters (observed at approx. 40 shutters removed in 30 minutes @ £50 an hour). = £3,781.25
Improve
*
•Pre fabricated steel shutter which are now reusable for all flared heads operation •L&A Reinforcements designed and fabricated steel shutters to trial that could be reused on site that would fit around the pile cap for concrete pour. Not only are the shutters reusable for future piles and work, they store easily on pallets as can be stacked within each other and they are more durable for the concrete pour part of the process. There is also reduced risk of them getting damaged by the machines filling muck around the shutters to hold in to position.
Control
*
•Ensure quality of flared heads are consistent with design specification despite the change of method •Monitor the number of rework compared to the old method to ensure the benefit is as per described
Transfer
*
•Sharing best practice •L&A has worked in other sectors such as the HS2 where this best practice method can be shared. •Added to NH Costain digital efficiency register National Highways Digital Efficiency Reference 4818 •Shared across Costain
What Lean Tools & Methodologies were used for your Lean Project?
If Other, please specify
*
Other Project Benefits
Meeting the needs of all users
Meeting the needs of all users - Other
*
Improving safety, health & wellbeing for all
Improving safety, health & wellbeing for all-Other
*
Delivering better environmental outcomes
Delivering better environmental outcomes - Other
*
Sustain a well-maintained and resilient network
Sustain well-maintained & resilient network- Other
*
Providing fast and reliable journeys
Providing fast and reliable journeys - Other
*
Achieve efficient delivery
Achieve efficient delivery - Other
*
Project Detail
National Highways Directorates involved in project
*
Division
Scheme Name
*
Scheme PIN
*
Was a Departure Required?
Was a Departure Required?
No
Was a Departure Required?
Yes
DAS Reference
*
How would you categorise your Lean project?
Uploaded Files
There are no notes to display.
You don't have permissions to view notes.
Error completing request.
Loading...
Loading...