Project Summary
Lean Project Name
*
*
Unique ID
*
Lean Project Description
*
*
Lean Project Summary
*
On the A1 Birtley to Coalhouse Project, we have two site compounds, located at Allerdene and Eighton Lodge. Both sites have been running on diesel generators since the start of the mobilisation. Subsequently, the project switched to Hydrotreated Vegetable Oil (HVO) as it was considered to be more sustainable and give rise to less emissions. However, the cost of HVO started to increase across time and the emissions are observed to be comparable to white diesel when comparing well to wheel. This suggested that it has a negative impact to carbon reduction objective that was set out initially to achieve.
Lean Project Benefits Summary
*
Total cost saving on HVO= £1,028,752.51 Total expenditure on LPG= -£468,479.06 Overall Savings= £560,273.46 Carbon reduction =556 TonnesCO2e
Roads Period Efficiency Reported
RP1 2015-2020
RP2 2020-2025
RP3 2025-2030
N/A
Efficiency Value Assured
*
£
Efficiency Register ID
Image
Choose File
---
Lean Construction Development Programme (LCDP) Project
Lean Construction Development Programme (LCDP) Project
No
Lean Construction Development Programme (LCDP) Project
Yes
Supplier
*
Contact Email
*
*
*
Stakeholders involved in project
*
Stakeholders Involved - Other
*
Problem Solving Strategy (DMAICT)
Define
*
On the A1 Birtley to Coalhouse Project, we have two site compounds, located at Allerdene and Eighton Lodge. Both sites have been running on diesel generators since the start of the mobilisation. Subsequently, the project switched to Hydrotreated Vegetable Oil (HVO) as it was considered to be more sustainable and give rise to less emissions. However, the cost of HVO started to increase across time and the emissions are observed to be comparable to white diesel when comparing well to wheel. This suggested that it has a negative impact to carbon reduction objective that was set out initially to achieve.
Measure
*
HVO costs= £1.74 per L HVO emissions= 2.51 kgCO2/L In addition, HVO prone to spillages when refuelling, causing contaminations to the surrounding
Analyse
*
Dec 2023 to Nov 2024 (Running costs and emissions till the end of the project) Total CO2 emissions= 2.51kgCO2/L x 584513L = 1467 tonnes CO2e If we stayed on HVO, the total expenditure for HVO is £1,028,752.51
Improve
*
Dec 2023 to Nov 2024 (Running costs and emissions till the end of the project) If we swapped to LPG, the total CO2 emissions= 1.56 kgCO2/L x 584513L = 911 kgCO2 The total expenditure on LPG is £468,479.06 which is significantly less than HVO
Control
*
Adlingtons, the supplier, proposed and offered an innovative way to power the site compound by using Liquid Petroleum Gas (LPG) tanks. By using LPG to power the site compound, emissions would be reduced compared to using HVO. The LPG tanks would be resized to suit the compound and be sited with suitably sized generators. This would offer a reduced noise output and eliminate spillages and ground contamination whilst refuelling the tanks.
Transfer
*
To be passed onto mobilisation team to consider when setting up new projects. If a compound cannot be connected to mains electricity and use a green tariff, then consider alternative fuels which give rise to less greenhouse gas emissions. I.e. LPG or hydrogen.
What Lean Tools & Methodologies were used for your Lean Project?
If Other, please specify
*
Other Project Benefits
Meeting the needs of all users
Meeting the needs of all users - Other
*
Improving safety, health & wellbeing for all
Improving safety, health & wellbeing for all-Other
*
Delivering better environmental outcomes
Delivering better environmental outcomes - Other
*
Sustain a well-maintained and resilient network
Sustain well-maintained & resilient network- Other
*
Providing fast and reliable journeys
Providing fast and reliable journeys - Other
*
Achieve efficient delivery
Achieve efficient delivery - Other
*
Project Detail
National Highways Directorates involved in project
*
Division
Scheme Name
*
Scheme PIN
*
Was a Departure Required?
Was a Departure Required?
No
Was a Departure Required?
Yes
DAS Reference
*
How would you categorise your Lean project?
Uploaded Files
There are no notes to display.
You don't have permissions to view notes.
Error completing request.
Loading...
Loading...